Licensed & insured · Fraser, MI · Serving Metro Detroit

Planning · exterior integration · construction

Home Additions That Look and Perform Like Part of the House

The hardest part of an addition is often the connection to the existing home. Roof geometry, foundation, drainage, siding, windows, utilities and interior circulation must meet without looking or performing like an afterthought. 3G begins with goals and site constraints, then defines the team and approvals needed for a complete scope.

Free, no-pressure estimate

Get Your Free Exterior Estimate

Tell us what you see and where the property is. A 3G team member will confirm the next step.

Warning signs
Project scope
Process
FAQs
Start with the condition

When to schedule an evaluation.

One symptom does not automatically mean full replacement. It does identify where a useful inspection should begin.

The household needs functional space more than a surface update

An entry, family room or utility area needs expansion

The lot and local requirements may support an addition

Roof and exterior work can be coordinated with new construction

A previous enclosure or addition has poor transitions

The homeowner wants a long-term plan before pricing finishes

Before & after

Roofing problems solved with a complete system approach

A good roof replacement should fix more than the surface appearance.

Before
After

Short downspout discharge corrected

A downspout that used to soak the same foundation area is extended or redirected so roof water is released farther from the home and away from high-traffic areas.

Before
After

Overflow point reviewed and improved

A recurring overflow area is reviewed for gutter pitch, debris, roof valley volume, fascia condition and downspout capacity so the system can carry water instead of dumping it over the edge.

Before
After

Roof replacement with water-control review

When roof water is moving too quickly or overflowing at gutters, 3G can review gutter size, drip edge, downspouts and leaf protection as part of the exterior plan.

The neighboring details

One service. Connected systems.

An addition affects almost every exterior system. The roof must drain, siding and openings need weather layers, gutters need new capacity and grade must carry water away.

Four clear stages

From first call to final review.

A different project does not need a different communication standard.

01

Share the condition

Address, symptom, timing and safe photos.

02

Evaluate the system

Main issue plus the transitions around it.

03

Approve the work

Written scope, selections, exclusions and price.

04

Install and review

Protection, updates, cleanup and walkthrough.

Customer proof

What homeowners remember.

Communication, fair expectations, cleanup and work that solves the original problem.

★★★★★
“In addition to a job well done I was most impressed with their excellent customer service, responsiveness and timeliness.”
Steve Wegner
4.5

224 public Google reviews.

Questions before the quote

Replacement Windows FAQs.

Begin with the space problem, property constraints and a realistic budget range. Design and technical scope should come before finish shopping.

Responsibility varies by project and jurisdiction. The agreement should identify design, engineering, zoning review, permits, inspections and fees.

Close coordination is often possible, but aged or discontinued roofing, brick and siding may not match exactly. Sometimes a deliberate complementary transition looks better than a near-match.

Existing framing, foundations, utilities and moisture conditions may not be fully visible before work begins. A written change-order process should define approval and pricing.